ITAC Assessment: OR0164
ITAC logo
ITAC Assessment: OR0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Frozen Vegetables
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area
n/a
Annual Production 288,500
ton
Production Hrs. Annual 5,824
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,921 10,048,945
kWh
Natural Gas $241,131 101,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.1212: Operate boilers on high fire setting $3,115 - - $3,115
-
MMBtu
-
02 2.2691: Shut off cooling if cold outside air will cool process $1,608 - $1,608
61,254
kWh
- -
03 2.4311: Recover mechanical energy $929 - $929
28,136
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,042 $500 - $2,042
-
MMBtu
-
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,127 $4,466 $1,127
36,635
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $10,419 - $419
16,120
kWh
- $10,000
TOTAL RECOMMENDED $19,240 $4,966 $4,083
142,145
kWh
$5,157
-
MMBtu
$10,000
TOTAL IMPLEMENTED $5,706 $4,966 $3,664
126,025
kWh
$2,042
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs