ITAC Assessment: OR0161
ITAC logo
ITAC Assessment: OR0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLANED LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 13
Plant Area
n/a
Annual Production 53,200
thousand feet
Production Hrs. Annual 2,550
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,013 1,297,773
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,119

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $384 $30 $384
8,206
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $289 $90 $289
6,155
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $183 $200 $183
3,810
kWh
04 2.6232: Install set-back timers $4,535 - $4,535
107,855
kWh
05 2.6212: Turn off equipment during breaks, reduce operating time $911 - $911
27,550
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $189 - $189
3,517
kWh
07 2.4133: Use most efficient type of electric motors $156 $1,147 $156
2,931
kWh
TOTAL RECOMMENDED $6,647 $1,467 $6,647
160,024
kWh
TOTAL IMPLEMENTED $6,119 $120 $6,119
149,766
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs