ITAC Assessment: OR0156
ITAC logo
ITAC Assessment: OR0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CHEESE, BUTTER
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area
n/a
Annual Production 4,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,357 1,072,685
kWh
LPG $63,532 9,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.8118: Check for accuracy of utility / power meters $23,479 - $23,479
-
kWh
- -
02 2.2163: Use minimum steam operating pressure $473 - - $473
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,966 $1,000 - $2,966
-
MMBtu
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $200 - $200
5,862
kWh
- -
05 2.6232: Install set-back timers $387 $360 $228
6,448
kWh
- $159
06 3.4115: Recover and reuse cooling water $3,527 $5,105 $(-347.0)
(-9,965)
kWh
$2,952
-
MMBtu
$922
07 2.4133: Use most efficient type of electric motors $102 $164 $102
2,052
kWh
- -
TOTAL RECOMMENDED $31,134 $6,629 $23,662
4,397
kWh
$6,391
-
MMBtu
$1,081
TOTAL IMPLEMENTED $7,268 $6,269 $(-45.0)
(-2,051)
kWh
$6,391
-
MMBtu
$922
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs