Assessment Year | 1992 |
---|---|
Principal Product | DIMENSIONAL LUMBER |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
n/a
|
Annual Production | 41,600
thousand feet
|
Production Hrs. Annual | 5,575
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $422,553 | 9,146,249 |
kWh
|
$0.046 |
Wood | $423,880 | 391,882 |
MMBtu
|
$1.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $138,196 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $127,017 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,759 | - |
$1,759
37,515
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $91,759 | $2,500 | - |
$91,759
-
MMBtu
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $15,051 | $2,000 |
$15,051
321,219
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $14,253 | - |
$11,479
310,375
kWh
|
- | $2,774 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,242 | $4,000 |
$8,242
177,315
kWh
|
- | - | |
06 | 2.3191: Use demand controller or load shedder | $2,937 | $3,600 |
$2,937
-
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,009 | $1,742 |
$1,009
21,395
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,186 | $17,265 |
$3,186
60,961
kWh
|
- | - | |
TOTAL RECOMMENDED | $138,196 | $31,107 |
$43,663
928,780
kWh
|
$91,759
-
MMBtu
|
$2,774 | ||
TOTAL IMPLEMENTED | $127,017 | $23,507 |
$32,484
751,465
kWh
|
$91,759
-
MMBtu
|
$2,774 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs