ITAC Assessment: OR0153
ITAC logo
ITAC Assessment: OR0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DIMENSIONAL LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area
n/a
Annual Production 41,600
thousand feet
Production Hrs. Annual 5,575
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $422,553 9,146,249
kWh
Wood $423,880 391,882
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,759 - $1,759
37,515
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $91,759 $2,500 - $91,759
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $15,051 $2,000 $15,051
321,219
kWh
- -
04 2.6232: Install set-back timers $14,253 - $11,479
310,375
kWh
- $2,774
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,242 $4,000 $8,242
177,315
kWh
- -
06 2.3191: Use demand controller or load shedder $2,937 $3,600 $2,937
-
kWh
- -
07 2.4133: Use most efficient type of electric motors $1,009 $1,742 $1,009
21,395
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,186 $17,265 $3,186
60,961
kWh
- -
TOTAL RECOMMENDED $138,196 $31,107 $43,663
928,780
kWh
$91,759
-
MMBtu
$2,774
TOTAL IMPLEMENTED $127,017 $23,507 $32,484
751,465
kWh
$91,759
-
MMBtu
$2,774
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs