Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Sheet metal specialty
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 105,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,870 1,474,640
kWh
Electricity Demand $39,010 4,644
kW-mo/yr
Electricity Fees $23,269 -
Natural Gas $21,112 2,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,181

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,003 $37,014 $17,476
178,327
kWh
$5,527
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,275 $1,660 $5,507
56,192
kWh
$768
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $5,535 $1,800 $4,955
50,557
kWh
$580
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,117 $4,992 $3,126
31,894
kWh
$991
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $2,739 $6,080 - - $2,739
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,042 $80 $739
7,537
kWh
$303
-
kW-mo/yr
-
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $895 $2,320 $870
8,874
kWh
$25
-
kW-mo/yr
-
08 2.7221: Lower temperature during the winter season and vice-versa $734 $120 $558
5,693
kWh
$176
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,340 $54,066 $33,231
339,074
kWh
$8,370
-
kW-mo/yr
$2,739
-
MMBtu
TOTAL IMPLEMENTED $39,181 $48,994 $29,366
299,643
kWh
$7,076
-
kW-mo/yr
$2,739
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs