Assessment Year | 2012 |
---|---|
Principal Product | Sheet metal specialty |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
105,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,870 | 1,474,640 |
kWh
|
$0.083 |
Electricity Demand | $39,010 | 4,644 |
kW-mo/yr
|
$8.40 |
Electricity Fees | $23,269 | - |
|
- |
Natural Gas | $21,112 | 2,320 |
MMBtu
|
$9.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,181 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,003 | $37,014 |
$17,476
178,327
kWh
|
$5,527
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,275 | $1,660 |
$5,507
56,192
kWh
|
$768
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $5,535 | $1,800 |
$4,955
50,557
kWh
|
$580
-
kW-mo/yr
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,117 | $4,992 |
$3,126
31,894
kWh
|
$991
-
kW-mo/yr
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $2,739 | $6,080 | - | - |
$2,739
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,042 | $80 |
$739
7,537
kWh
|
$303
-
kW-mo/yr
|
- | |
07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $895 | $2,320 |
$870
8,874
kWh
|
$25
-
kW-mo/yr
|
- | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $734 | $120 |
$558
5,693
kWh
|
$176
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $44,340 | $54,066 |
$33,231
339,074
kWh
|
$8,370
-
kW-mo/yr
|
$2,739
-
MMBtu
|
||
TOTAL IMPLEMENTED | $39,181 | $48,994 |
$29,366
299,643
kWh
|
$7,076
-
kW-mo/yr
|
$2,739
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs