ITAC Assessment: OR0152
ITAC logo
ITAC Assessment: OR0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DIMENSIONAL LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 65,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,132,628 27,406,800
kWh
Wood $601,425 7,993,021
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $993 $711 $848
17,878
kWh
$145
02 2.6232: Install set-back timers $26,976 $20,752 $21,981
594,080
kWh
$4,995
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,045 $17,766 $12,488
264,068
kWh
$2,557
04 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $27,941 $49,500 $27,941
804,220
kWh
-
05 2.4133: Use most efficient type of electric motors $1,458 $2,813 $1,458
31,946
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $83,967 $300,000 $83,967
1,823,857
kWh
-
TOTAL RECOMMENDED $156,380 $391,542 $148,683
3,536,049
kWh
$7,697
TOTAL IMPLEMENTED $44,472 $42,042 $36,775
907,972
kWh
$7,697
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs