ITAC Assessment: OR0149
ITAC logo
ITAC Assessment: OR0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELECTRIC HEATERS
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 382,600
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,234 1,211,313
kWh
Natural Gas $71,244 17,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $1,784 - $1,225
56,272
kWh
- $559
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $214 - $214
7,327
kWh
- -
03 2.2426: Use waste heat from flue gases to heat space conditioning air $7,907 $2,071 - $7,907
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $288 $200 $288
10,551
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,213 $1,000 $1,213
44,842
kWh
- -
06 2.4133: Use most efficient type of electric motors $182 $858 $182
6,741
kWh
- -
07 2.2511: Insulate bare equipment $1,929 $3,837 - $1,929
-
MMBtu
-
TOTAL RECOMMENDED $13,517 $7,966 $3,122
125,733
kWh
$9,836
-
MMBtu
$559
TOTAL IMPLEMENTED $13,517 $7,966 $3,122
125,733
kWh
$9,836
-
MMBtu
$559
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs