ITAC Assessment: OR0135
ITAC logo
ITAC Assessment: OR0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FROZEN SEAFOOD
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 150,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,324 592,028
kWh
Fuel Oil #2 $1,587 242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $322 - $270
5,275
kWh
- $52
02 2.6232: Install set-back timers $175 - $93
1,758
kWh
- $82
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,629 - $1,629
31,067
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $317 $850 $317
4,982
kWh
- -
05 2.4133: Use most efficient type of electric motors $159 $482 $159
1,758
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $124 - - $124
-
MMBtu
-
TOTAL RECOMMENDED $2,726 $1,332 $2,468
44,840
kWh
$124
-
MMBtu
$134
TOTAL IMPLEMENTED $2,726 $1,332 $2,468
44,840
kWh
$124
-
MMBtu
$134
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs