ITAC Assessment: OR0134
ITAC logo
ITAC Assessment: OR0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FIR STUDS
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 16
thousand feet
Production Hrs. Annual 1,960
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,139 1,828,839
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $655 - $655
8,499
kWh
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,960 - $3,080
61,254
kWh
$880
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $788 $800 $788
10,844
kWh
-
04 2.3212: Optimize plant power factor $1,675 $3,750 $1,675
-
kWh
-
05 2.4133: Use most efficient type of electric motors $521 $1,288 $521
6,741
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,223 $5,650 $1,223
16,120
kWh
-
07 2.6232: Install set-back timers $3,087 - $2,433
57,151
kWh
$654
08 2.7111: Reduce illumination to minimum necessary levels $527 - $396
7,913
kWh
$131
TOTAL RECOMMENDED $12,436 $11,488 $10,771
168,522
kWh
$1,665
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs