| Assessment Year | 1991 |
|---|---|
| Principal Product | FROZEN FISH & SEAFOOD |
| NAICS |
n/a
|
| SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
n/a
|
| Annual Production | 17,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $163,217 | 1,934,642 |
kWh
|
$0.084 |
| LPG | $28,609 | 3,318 |
MMBtu
|
$8.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,665 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $736 | - |
$639
12,309
kWh
|
- | $97 | |
| 02 | 2.6218: Turn off equipment when not in use | $317 | - | - | - | $317 | |
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $2,074 | $500 |
$2,074
39,859
kWh
|
- | - | |
| 04 | 3.4115: Recover and reuse cooling water | $2,804 | $1,727 |
$126
2,345
kWh
|
- | $2,678 | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,538 | $1,000 | - |
$1,538
-
MMBtu
|
- | |
| 06 | 2.2447: Heat water with exhaust heat | $6,513 | $5,744 |
$6,513
125,147
kWh
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $878 | $5,922 |
$878
13,482
kWh
|
- | - | |
| 08 | 2.2694: Use highest temperature for chilling or cold storage | $1,040 | $1,200 |
$1,040
19,930
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $632 | $898 |
$354
4,982
kWh
|
- | $278 | |
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,450 | $10,200 |
$3,450
53,634
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,982 | $27,191 |
$15,074
271,688
kWh
|
$1,538
-
MMBtu
|
$3,370 | ||
| TOTAL IMPLEMENTED | $19,665 | $27,191 |
$15,074
271,688
kWh
|
$1,538
-
MMBtu
|
$3,053 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs