ITAC Assessment: UD0307
ITAC logo
ITAC Assessment: UD0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product DOORS, METAL ACCESS,ETC.
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area
n/a
Annual Production 2,375
ton
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,042 1,075,322
kWh
Natural Gas $47,280 9,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4156: Use flow control valves on equipment to optimize water use $4,728 $100 - - $4,728
02 2.6212: Turn off equipment during breaks, reduce operating time $140 $200 $27
1,172
kWh
$113
-
MMBtu
-
03 2.7492: Use proper thickness of insulation on building envelope $721 $1,425 - $721
-
MMBtu
-
TOTAL RECOMMENDED $5,589 $1,725 $27
1,172
kWh
$834
-
MMBtu
$4,728
TOTAL IMPLEMENTED $4,728 $100 - - $4,728
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs