ITAC Assessment: OR0106
ITAC logo
ITAC Assessment: OR0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DIMENSIONAL LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 205
Plant Area
n/a
Annual Production 226,000
thousand feet
Production Hrs. Annual 4,320
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $886,323 24,202,814
kWh
Natural Gas $87,474 23,652
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,459 - $5,459
248,242
kWh
-
02 2.6232: Install set-back timers $13,315 - $11,107
504,982
kWh
$2,208
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,030 $20,000 $30,030
868,113
kWh
-
04 2.4133: Use most efficient type of electric motors $1,238 $2,448 $1,238
31,653
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,897 $40,925 $10,897
259,379
kWh
-
TOTAL RECOMMENDED $60,939 $63,373 $58,731
1,912,369
kWh
$2,208
TOTAL IMPLEMENTED $60,939 $63,373 $58,731
1,912,369
kWh
$2,208
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs