ITAC Assessment: OR0085
ITAC logo
ITAC Assessment: OR0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PLASTIC BOTTLES
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 45,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,580 7,155,920
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.5314: Use in-process recycling whenever possible $112,370 $38,400 $(-8,336.0)
(-255,276)
kWh
$120,706
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,965 $2,806 $1,463
62,134
kWh
$3,502
03 2.4221: Install compressor air intakes in coolest locations $389 $240 $389
13,482
kWh
-
04 2.4133: Use most efficient type of electric motors $483 $909 $483
18,464
kWh
-
05 2.2511: Insulate bare equipment $747 $1,385 $747
40,445
kWh
-
06 2.2621: Modify refrigeration system to operate at a lower pressure $2,647 $7,200 $2,647
143,025
kWh
-
TOTAL RECOMMENDED $121,601 $50,940 $(-2,607.0)
22,274
kWh
$124,208
TOTAL IMPLEMENTED $117,818 $42,115 $(-6,390.0)
(-174,678)
kWh
$124,208
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs