ITAC Assessment: OR0082
ITAC logo
ITAC Assessment: OR0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product METAL CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area
n/a
Annual Production 129,000,000
pieces
Production Hrs. Annual 4,208
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,639 1,114,009
kWh
Natural Gas $11,207 1,913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6232: Install set-back timers $4,474 - $4,474
92,907
kWh
-
02 2.2437: Recover waste heat from equipment $2,608 $75 $2,608
130,422
kWh
-
03 3.4151: Minimize water usage $870 $75 - $870
04 2.7142: Utilize higher efficiency lamps and/or ballasts $382 $240 $452
10,551
kWh
$(-70.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,055 $500 $1,055
21,981
kWh
-
06 2.4133: Use most efficient type of electric motors $103 $182 $103
2,052
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $498 $700 $744
17,292
kWh
$(-246.0)
08 2.3212: Optimize plant power factor $161 $450 $161
-
kWh
-
TOTAL RECOMMENDED $10,151 $2,222 $9,597
275,205
kWh
$554
TOTAL IMPLEMENTED $9,990 $1,772 $9,436
275,205
kWh
$554
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs