ITAC Assessment: OR0062
ITAC logo
ITAC Assessment: OR0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product COMPOSITE PANELS
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 797,739
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,137 7,822,685
kWh
Natural Gas $281,445 68,461
MMBtu
Wood $59,442 53,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,906

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
01 2.2122: Install / repair insulation on condensate lines $1,178 $418 - $1,042
-
MMBtu
$136
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $1,507 $768 $1,507
36,635
kWh
- - -
03 2.2122: Install / repair insulation on condensate lines $500 $255 - $443
-
MMBtu
$57
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,561 $1,210 $814
19,930
kWh
- - $747
05 2.7142: Utilize higher efficiency lamps and/or ballasts $518 $467 $809
19,637
kWh
- - $(-291.0)
06 2.4221: Install compressor air intakes in coolest locations $227 $300 $227
5,569
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $642 $1,144 $1,417
34,584
kWh
- - $(-775.0)
08 2.3212: Optimize plant power factor $5,423 $11,400 $5,423
-
kWh
- - -
TOTAL RECOMMENDED $11,556 $15,962 $10,197
116,355
kWh
$1,485
-
MMBtu
$193
-
MMBtu
$(-319.0)
TOTAL IMPLEMENTED $5,906 $4,262 $4,547
110,786
kWh
$1,485
-
MMBtu
$193
-
MMBtu
$(-319.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings