Assessment Year | 1989 |
---|---|
Principal Product | TREAD RUBBER |
NAICS |
n/a
|
SIC | 3011: Tires and Inner Tubes |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 5,610
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,825 | 785,170 |
kWh
|
$0.041 |
Natural Gas | $27,390 | 6,046 |
MMBtu
|
$4.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,189 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,409 | $100 | - |
$2,409
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $219 | $97 | - |
$219
-
MMBtu
|
|
03 | 2.4133: Use most efficient type of electric motors | $65 | $46 |
$65
1,465
kWh
|
- | |
04 | 2.3212: Optimize plant power factor | $2,487 | $2,100 |
$2,487
-
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $587 | $500 |
$587
14,361
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $128 | $220 |
$128
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $5,895 | $3,063 |
$3,267
19,050
kWh
|
$2,628
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,189 | $866 |
$780
19,050
kWh
|
$2,409
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs