ITAC Assessment: OR0060
ITAC logo
ITAC Assessment: OR0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TREAD RUBBER
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 5,610
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,825 785,170
kWh
Natural Gas $27,390 6,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,409 $100 - $2,409
-
MMBtu
02 2.2511: Insulate bare equipment $219 $97 - $219
-
MMBtu
03 2.4133: Use most efficient type of electric motors $65 $46 $65
1,465
kWh
-
04 2.3212: Optimize plant power factor $2,487 $2,100 $2,487
-
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $587 $500 $587
14,361
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $128 $220 $128
3,224
kWh
-
TOTAL RECOMMENDED $5,895 $3,063 $3,267
19,050
kWh
$2,628
-
MMBtu
TOTAL IMPLEMENTED $3,189 $866 $780
19,050
kWh
$2,409
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs