ITAC Assessment: OR0046
ITAC logo
ITAC Assessment: OR0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BEEF CUTS & POULTRY FEED
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 85,000,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,893 6,636,870
kWh
Natural Gas $231,988 52,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $3,516 - $3,516
135,111
kWh
- -
02 2.2621: Modify refrigeration system to operate at a lower pressure $1,907 - $1,907
73,271
kWh
- -
03 2.2123: Insulate feedwater tank $678 $259 - $678
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $106 $100 $106
4,103
kWh
- -
05 2.3212: Optimize plant power factor $4,640 $4,500 $4,640
-
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $21,573 $42,000 $5,366
206,331
kWh
- $16,207
07 2.4221: Install compressor air intakes in coolest locations $280 $500 $280
10,844
kWh
- -
TOTAL RECOMMENDED $32,700 $47,359 $15,815
429,660
kWh
$678
-
MMBtu
$16,207
TOTAL IMPLEMENTED $31,742 $46,600 $15,535
418,816
kWh
- $16,207
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs