ITAC Assessment: GT0318
ITAC logo
ITAC Assessment: GT0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GALVANIZED WIRE
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area
n/a
Annual Production 16,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,352 2,607,269
kWh
Natural Gas $170,211 32,119
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $44,700 $30,000 - $44,700
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,650 $41,030 $16,650
232,708
kWh
-
03 2.4133: Use most efficient type of electric motors $1,820 $1,800 $1,820
25,498
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,380 $8,000 $2,380
33,118
kWh
-
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,290 $1,500 $2,290
31,946
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $940 - $940
13,189
kWh
-
TOTAL RECOMMENDED $68,780 $82,330 $24,080
336,459
kWh
$44,700
-
MMBtu
TOTAL IMPLEMENTED $22,260 $50,530 $22,260
310,961
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs