| Assessment Year | 1987 |
|---|---|
| Principal Product | GALVANIZED WIRE |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $5 M to 10M |
| # of Employees | 22 |
| Plant Area |
n/a
|
| Annual Production | 16,000
ton
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $186,352 | 2,607,269 |
kWh
|
$0.071 |
| Natural Gas | $170,211 | 32,119 |
MMBtu
|
$5.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $68,780 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,260 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $44,700 | $30,000 | - |
$44,700
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,650 | $41,030 |
$16,650
232,708
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,820 | $1,800 |
$1,820
25,498
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,380 | $8,000 |
$2,380
33,118
kWh
|
- | |
| 05 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,290 | $1,500 |
$2,290
31,946
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $940 | - |
$940
13,189
kWh
|
- | |
| TOTAL RECOMMENDED | $68,780 | $82,330 |
$24,080
336,459
kWh
|
$44,700
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $22,260 | $50,530 |
$22,260
310,961
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs