ITAC Assessment: OR0044
ITAC logo
ITAC Assessment: OR0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FROZEN CORN & CARROTS
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 94,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,882 13,647,714
kWh
Natural Gas $214,628 56,367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $11,498 - $11,498
332,649
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,775 $500 - $1,775
-
MMBtu
-
03 2.2441: Preheat boiler makeup water with waste process heat $3,200 $1,108 - $3,200
-
MMBtu
-
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $1,512 $676 - $1,512
-
MMBtu
-
05 2.2444: Use hot process fluids to preheat incoming process fluids $3,162 $2,550 - $2,918
-
MMBtu
$244
06 2.4221: Install compressor air intakes in coolest locations $297 $250 $297
8,499
kWh
- -
07 2.2444: Use hot process fluids to preheat incoming process fluids $10,545 - - $9,731
-
MMBtu
$814
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,958 $1,911 $618
17,878
kWh
- $1,340
09 2.4133: Use most efficient type of electric motors $280 $275 $280
8,206
kWh
- -
10 2.3212: Optimize plant power factor $14,889 $19,500 $14,889
-
kWh
- -
11 2.2414: Use waste heat from hot flue gases to preheat $1,525 $3,063 - $1,525
-
MMBtu
-
TOTAL RECOMMENDED $50,641 $29,833 $27,582
367,232
kWh
$20,661
-
MMBtu
$2,398
TOTAL IMPLEMENTED $21,765 $7,508 $12,413
359,026
kWh
$8,012
-
MMBtu
$1,340
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs