Assessment Year | 1988 |
---|---|
Principal Product | FROZEN CORN & CARROTS |
NAICS |
n/a
|
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 94,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $471,882 | 13,647,714 |
kWh
|
$0.035 |
Natural Gas | $214,628 | 56,367 |
MMBtu
|
$3.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,641 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $11,498 | - |
$11,498
332,649
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,775 | $500 | - |
$1,775
-
MMBtu
|
- | |
03 | 2.2441: Preheat boiler makeup water with waste process heat | $3,200 | $1,108 | - |
$3,200
-
MMBtu
|
- | |
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $1,512 | $676 | - |
$1,512
-
MMBtu
|
- | |
05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $3,162 | $2,550 | - |
$2,918
-
MMBtu
|
$244 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $297 | $250 |
$297
8,499
kWh
|
- | - | |
07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $10,545 | - | - |
$9,731
-
MMBtu
|
$814 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,958 | $1,911 |
$618
17,878
kWh
|
- | $1,340 | |
09 | 2.4133: Use most efficient type of electric motors | $280 | $275 |
$280
8,206
kWh
|
- | - | |
10 | 2.3212: Optimize plant power factor | $14,889 | $19,500 |
$14,889
-
kWh
|
- | - | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $1,525 | $3,063 | - |
$1,525
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $50,641 | $29,833 |
$27,582
367,232
kWh
|
$20,661
-
MMBtu
|
$2,398 | ||
TOTAL IMPLEMENTED | $21,765 | $7,508 |
$12,413
359,026
kWh
|
$8,012
-
MMBtu
|
$1,340 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs