ITAC Assessment: OR0042
ITAC logo
ITAC Assessment: OR0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HARDWOOD PLYWOOD
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 140
thousand feet
Production Hrs. Annual 7,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $901,685 21,635,991
kWh
Natural Gas $12,487 2,709
MMBtu
Wood $149,020 269,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,776 - $569
13,482
kWh
$2,207
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,164 $5,000 $22,164
531,946
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,349 $500 $2,349
56,272
kWh
-
04 2.4133: Use most efficient type of electric motors $1,087 $623 $1,087
26,084
kWh
-
05 2.3212: Optimize plant power factor $2,293 $4,800 $2,293
-
kWh
-
06 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $36,759 - $36,759
875,147
kWh
-
TOTAL RECOMMENDED $67,428 $10,923 $65,221
1,502,931
kWh
$2,207
TOTAL IMPLEMENTED $28,320 $10,423 $26,113
571,512
kWh
$2,207
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs