Assessment Year | 1988 |
---|---|
Principal Product | STEEL PIPE AND COATING |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $273,540 | 5,070,633 |
kWh
|
$0.054 |
Natural Gas | $98,315 | 22,030 |
MMBtu
|
$4.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,450 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,463 | - |
$6,463
-
kWh
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,466 | $300 |
$14,466
-
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,754 | $500 |
$2,754
50,996
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $37,296 | $10,000 |
$37,296
691,383
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $1,893 | $2,025 | - |
$1,893
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $91 | $176 |
$91
1,758
kWh
|
- | |
07 | 2.3212: Optimize plant power factor | $2,309 | $6,000 |
$2,309
-
kWh
|
- | |
TOTAL RECOMMENDED | $65,272 | $19,001 |
$63,379
744,137
kWh
|
$1,893
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,450 | $16,676 |
$42,450
744,137
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs