ITAC Assessment: OR0037
ITAC logo
ITAC Assessment: OR0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STEEL PIPE AND COATING
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,540 5,070,633
kWh
Natural Gas $98,315 22,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,463 - $6,463
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,466 $300 $14,466
-
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,754 $500 $2,754
50,996
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $37,296 $10,000 $37,296
691,383
kWh
-
05 2.2511: Insulate bare equipment $1,893 $2,025 - $1,893
-
MMBtu
06 2.4133: Use most efficient type of electric motors $91 $176 $91
1,758
kWh
-
07 2.3212: Optimize plant power factor $2,309 $6,000 $2,309
-
kWh
-
TOTAL RECOMMENDED $65,272 $19,001 $63,379
744,137
kWh
$1,893
-
MMBtu
TOTAL IMPLEMENTED $42,450 $16,676 $42,450
744,137
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs