Assessment Year | 1993 |
---|---|
Principal Product | PHARMACEUTICALS |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 420 |
Plant Area |
n/a
|
Annual Production | 56,000,000
pieces
|
Production Hrs. Annual | 2,298
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $437,829 | 11,788,980 |
kWh
|
$0.037 |
Natural Gas | $103,845 | 37,214 |
MMBtu
|
$2.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,303 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $3,776 | $5,655 |
$3,645
98,183
kWh
|
- | $131 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $547 | $1,440 |
$283
7,620
kWh
|
- | $264 | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $176 | - |
$176
4,689
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,399 | $300 | - |
$2,399
-
MMBtu
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $497 | $580 | - |
$497
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,936 | $3,455 |
$1,936
52,169
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $176 | $392 |
$176
4,689
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $776 | - |
$776
20,809
kWh
|
- | - | |
TOTAL RECOMMENDED | $10,283 | $11,822 |
$6,992
188,159
kWh
|
$2,896
-
MMBtu
|
$395 | ||
TOTAL IMPLEMENTED | $7,303 | $6,347 |
$4,773
128,370
kWh
|
$2,399
-
MMBtu
|
$131 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs