Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PHARMACEUTICALS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 420
Plant Area
n/a
Annual Production 56,000,000
pieces
Production Hrs. Annual 2,298
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $437,829 11,788,980
kWh
Natural Gas $103,845 37,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,776 $5,655 $3,645
98,183
kWh
- $131
02 2.7142: Utilize higher efficiency lamps and/or ballasts $547 $1,440 $283
7,620
kWh
- $264
03 2.7111: Reduce illumination to minimum necessary levels $176 - $176
4,689
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,399 $300 - $2,399
-
MMBtu
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $497 $580 - $497
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $1,936 $3,455 $1,936
52,169
kWh
- -
07 2.4133: Use most efficient type of electric motors $176 $392 $176
4,689
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $776 - $776
20,809
kWh
- -
TOTAL RECOMMENDED $10,283 $11,822 $6,992
188,159
kWh
$2,896
-
MMBtu
$395
TOTAL IMPLEMENTED $7,303 $6,347 $4,773
128,370
kWh
$2,399
-
MMBtu
$131
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs