ITAC Assessment: OR0022
ITAC logo
ITAC Assessment: OR0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LIFT TRUCKS ATTACHMENTS
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,425 4,199,004
kWh
Natural Gas $24,987 5,627
MMBtu
Fuel Oil #6 $4,057 1,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $909 $304 $909
16,706
kWh
- -
02 2.7261: Install timers and/or thermostats $1,762 $1,250 $532
9,965
kWh
$1,230
-
MMBtu
-
03 2.2122: Install / repair insulation on condensate lines $232 $142 - $232
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,969 $6,119 $6,107
113,130
kWh
- $(-138.0)
05 2.1233: Analyze flue gas for proper air/fuel ratio $267 $300 - $267
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $99 $146 $99
1,758
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $265 $402 $451
8,206
kWh
- $(-186.0)
TOTAL RECOMMENDED $9,503 $8,663 $8,098
149,765
kWh
$1,729
-
MMBtu
$(-324.0)
TOTAL IMPLEMENTED $8,362 $8,217 $7,189
133,059
kWh
$1,497
-
MMBtu
$(-324.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs