ITAC Assessment: OR0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLYWOOD VENEER
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 60,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,816 4,682,884
kWh
Natural Gas $506,123 120,020
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,078 - $2,078
41,618
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,607 $42 $1,607
32,239
kWh
-
03 2.1213: Direct warmest air to combustion intake $825 $500 - $825
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $655 $500 $655
13,189
kWh
-
05 2.2136: Install / repair insulation on steam lines $1,436 $965 - $1,436
-
MMBtu
06 2.4133: Use most efficient type of electric motors $744 $704 $744
14,947
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $1,137 $2,275 - $1,137
-
MMBtu
08 2.3212: Optimize plant power factor $1,140 $2,370 $1,140
-
kWh
-
TOTAL RECOMMENDED $9,622 $7,356 $6,224
101,993
kWh
$3,398
-
MMBtu
TOTAL IMPLEMENTED $3,477 $1,204 $3,477
69,754
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs