ITAC Assessment: AM0376
ITAC logo
ITAC Assessment: AM0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Oil field drilling bits
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 184,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $620,615 21,119,871
kWh
Electricity Demand $234,214 37,303
kW-mo/yr
Natural Gas $99,165 30,402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $77,809 $157,500 $57,903
2,144,490
kWh
$19,906
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,313 $32,300 $14,395
568,288
kWh
$4,918
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,410 $3,340 $360
13,189
kWh
$120
-
kW-mo/yr
$4,930
04 2.6218: Turn off equipment when not in use $1,250 - $1,250
46,307
kWh
- -
05 2.7131: Add area lighting switches $950 $640 $950
35,463
kWh
- -
06 2.7134: Use photocell controls $730 $605 $730
26,964
kWh
- -
07 2.7132: Install timers on light switches in little used areas $700 $350 $700
25,791
kWh
- -
08 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $600 $1,030 $600
21,981
kWh
- -
TOTAL RECOMMENDED $106,762 $195,765 $76,888
2,882,473
kWh
$24,944
-
kW-mo/yr
$4,930
TOTAL IMPLEMENTED $8,390 $5,965 $3,340
123,388
kWh
$120
-
kW-mo/yr
$4,930
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs