Assessment Year | 2000 |
---|---|
Principal Product | Oil field drilling bits |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
184,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $620,615 | 21,119,871 |
kWh
|
$0.029 |
Electricity Demand | $234,214 | 37,303 |
kW-mo/yr
|
$6.28 |
Natural Gas | $99,165 | 30,402 |
MMBtu
|
$3.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,762 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,390 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $77,809 | $157,500 |
$57,903
2,144,490
kWh
|
$19,906
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,313 | $32,300 |
$14,395
568,288
kWh
|
$4,918
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,410 | $3,340 |
$360
13,189
kWh
|
$120
-
kW-mo/yr
|
$4,930 | |
04 | 2.6218: Turn off equipment when not in use | $1,250 | - |
$1,250
46,307
kWh
|
- | - | |
05 | 2.7131: Add area lighting switches | $950 | $640 |
$950
35,463
kWh
|
- | - | |
06 | 2.7134: Use photocell controls | $730 | $605 |
$730
26,964
kWh
|
- | - | |
07 | 2.7132: Install timers on light switches in little used areas | $700 | $350 |
$700
25,791
kWh
|
- | - | |
08 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $600 | $1,030 |
$600
21,981
kWh
|
- | - | |
TOTAL RECOMMENDED | $106,762 | $195,765 |
$76,888
2,882,473
kWh
|
$24,944
-
kW-mo/yr
|
$4,930 | ||
TOTAL IMPLEMENTED | $8,390 | $5,965 |
$3,340
123,388
kWh
|
$120
-
kW-mo/yr
|
$4,930 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs