ITAC Assessment: OR0007
ITAC logo
ITAC Assessment: OR0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product METAL CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area
n/a
Annual Production 146,600
pieces
Production Hrs. Annual 4,950
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,690 1,668,523
kWh
Natural Gas $32,167 6,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $4,816 $20 - $4,816
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $345 - $345
10,258
kWh
- -
03 2.7314: Reduce ventilation air $4,062 $11 $890
26,084
kWh
$3,172
-
MMBtu
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,646 $1,700 $3,646
107,268
kWh
- -
05 2.2511: Insulate bare equipment $677 $168 $677
39,566
kWh
- -
06 2.2437: Recover waste heat from equipment $7,065 $5,550 - $7,065
-
MMBtu
-
07 2.7492: Use proper thickness of insulation on building envelope $8,339 $6,586 - $8,339
-
MMBtu
-
08 2.7492: Use proper thickness of insulation on building envelope $4,413 $3,346 - $4,413
-
MMBtu
-
09 2.3212: Optimize plant power factor $2,736 $2,420 $2,736
-
kWh
- -
10 2.7446: Utilize sensors controlling roof and wall openings $49 $80 $49
1,465
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $3,933 $8,957 $1,580
46,600
kWh
- $2,353
TOTAL RECOMMENDED $40,081 $28,838 $9,923
231,241
kWh
$27,805
-
MMBtu
$2,353
TOTAL IMPLEMENTED $11,959 $2,451 $3,971
36,342
kWh
$7,988
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs