| Assessment Year | 1987 |
|---|---|
| Principal Product | SILICON WAFERS |
| NAICS |
n/a
|
| SIC | 3674: Semiconductors and Related Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 325 |
| Plant Area |
n/a
|
| Annual Production | 148
thousand feet
|
| Production Hrs. Annual | 8,448
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $497,236 | 17,720,985 |
kWh
|
$0.028 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,462 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $451 | - |
$333
11,723
kWh
|
$118 | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,009 | $8,000 |
$1,009
36,049
kWh
|
- | |
| 03 | 3.4156: Use flow control valves on equipment to optimize water use | $8,718 | $1,000 | - | $8,718 | |
| 04 | 3.4156: Use flow control valves on equipment to optimize water use | $25,130 | $7,000 | - | $25,130 | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $718 | $200 |
$718
25,498
kWh
|
- | |
| 06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,143 | $600 |
$901
31,946
kWh
|
$242 | |
| 07 | 2.4133: Use most efficient type of electric motors | $874 | $1,320 |
$874
31,067
kWh
|
- | |
| 08 | 2.2444: Use hot process fluids to preheat incoming process fluids | $6,089 | $13,772 |
$6,089
217,175
kWh
|
- | |
| TOTAL RECOMMENDED | $44,132 | $31,892 |
$9,924
353,458
kWh
|
$34,208 | ||
| TOTAL IMPLEMENTED | $12,462 | $11,120 |
$3,502
124,560
kWh
|
$8,960 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs