*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SILICON WAFERS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area
n/a
Annual Production 148
thousand feet
Production Hrs. Annual 8,448
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $497,236 17,720,985
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6232: Install set-back timers $451 - $333
11,723
kWh
$118
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,009 $8,000 $1,009
36,049
kWh
-
03 3.4156: Use flow control valves on equipment to optimize water use $8,718 $1,000 - $8,718
04 3.4156: Use flow control valves on equipment to optimize water use $25,130 $7,000 - $25,130
05 2.4221: Install compressor air intakes in coolest locations $718 $200 $718
25,498
kWh
-
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,143 $600 $901
31,946
kWh
$242
07 2.4133: Use most efficient type of electric motors $874 $1,320 $874
31,067
kWh
-
08 2.2444: Use hot process fluids to preheat incoming process fluids $6,089 $13,772 $6,089
217,175
kWh
-
TOTAL RECOMMENDED $44,132 $31,892 $9,924
353,458
kWh
$34,208
TOTAL IMPLEMENTED $12,462 $11,120 $3,502
124,560
kWh
$8,960
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs