ITAC Assessment: OR0001
ITAC logo
ITAC Assessment: OR0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLYWOOD
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 93
Plant Area
n/a
Annual Production 128,000
thousand feet
Production Hrs. Annual 5,808
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,950 7,910,024
kWh
Natural Gas $162,350 38,249
MMBtu
Wood $135,000 135,003
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,105 - $1,105
24,619
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,491 $300 - $4,611
-
MMBtu
- $(-120.0)
03 2.4221: Install compressor air intakes in coolest locations $658 $50 $658
14,654
kWh
- - -
04 3.6123: Burn wood by-products for heat $49,615 $15,000 - $53,975
-
MMBtu
$(-4,360.0)
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,718 $2,032 $1,608
35,756
kWh
- - $110
06 2.4133: Use most efficient type of electric motors $1,250 $1,844 $1,250
27,843
kWh
- - -
07 2.3212: Optimize plant power factor $2,856 $3,960 $2,856
-
kWh
- - -
TOTAL RECOMMENDED $61,693 $23,186 $7,477
102,872
kWh
$58,586
-
MMBtu
$(-4,360.0)
-
MMBtu
$(-10.0)
TOTAL IMPLEMENTED $12,078 $8,186 $7,477
102,872
kWh
$4,611
-
MMBtu
- $(-10.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings