Assessment Year | 1987 |
---|---|
Principal Product | PLYWOOD |
NAICS |
n/a
|
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 93 |
Plant Area |
n/a
|
Annual Production | 128,000
thousand feet
|
Production Hrs. Annual | 5,808
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $355,950 | 7,910,024 |
kWh
|
$0.045 |
Natural Gas | $162,350 | 38,249 |
MMBtu
|
$4.24 |
Wood | $135,000 | 135,003 |
MMBtu
|
$1.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,078 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,105 | - |
$1,105
24,619
kWh
|
- | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,491 | $300 | - |
$4,611
-
MMBtu
|
- | $(-120.0) | |
03 | 2.4221: Install compressor air intakes in coolest locations | $658 | $50 |
$658
14,654
kWh
|
- | - | - | |
04 | 3.6123: Burn wood by-products for heat | $49,615 | $15,000 | - |
$53,975
-
MMBtu
|
$(-4,360.0)
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,718 | $2,032 |
$1,608
35,756
kWh
|
- | - | $110 | |
06 | 2.4133: Use most efficient type of electric motors | $1,250 | $1,844 |
$1,250
27,843
kWh
|
- | - | - | |
07 | 2.3212: Optimize plant power factor | $2,856 | $3,960 |
$2,856
-
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $61,693 | $23,186 |
$7,477
102,872
kWh
|
$58,586
-
MMBtu
|
$(-4,360.0)
-
MMBtu
|
$(-10.0) | ||
TOTAL IMPLEMENTED | $12,078 | $8,186 |
$7,477
102,872
kWh
|
$4,611
-
MMBtu
|
- | $(-10.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs