Assessment Year | 2024 |
---|---|
Principal Product | Robotic production machinery components |
NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
88,000
ft2
|
Annual Production | 600,000
pieces
|
Production Hrs. Annual | 5,202
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $76,078 | 1,086,821 |
kWh
|
$0.070 | |
Electricity Demand | $38,290 | 2,905 |
kW-mo/yr
|
$13.18 | |
Electricity Fees | $16,187 | - |
|
- | |
Natural Gas | $4,945 | 457 |
MMBtu
|
$10.82 | |
Waste Disposal Costs | |||||
Water Usage | $3,143 | 228 |
Tgal
|
$13.79 | |
Water Disposal | $1,085 | 89 |
Tgal
|
$12.19 | |
TOTAL YEARLY COSTS | $139,728 | ||||
RECOMMENDED SAVINGS* | $38,206 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $4,337 | - | - | - | $4,337 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,418 | $8,695 |
$12,028
171,826
kWh
|
$3,390
-
kW-mo/yr
|
- | |
03 | 2.9114: Use solar heat to make electricty | $8,003 | $91,875 |
$8,003
114,323
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,219 | $310 |
$3,219
45,990
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $585 | $295 |
$466
6,658
kWh
|
$119
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $865 | - |
$865
12,352
kWh
|
- | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $5,779 | $13,845 |
$5,779
82,555
kWh
|
- | - | |
TOTAL RECOMMENDED | $38,206 | $115,020 |
$30,360
433,704
kWh
|
$3,509
-
kW-mo/yr
|
$4,337 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs