ITAC Assessment: OK1118
ITAC logo
ITAC Assessment: OK1118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Material handling equipment
NAICS 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 60,000
ft2
Annual Production 150
ton
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,193 604,570
kWh
Natural Gas $8,275 1,109
MMBtu
LPG $3,496 142
MMBtu
Waste Disposal Costs
Water Usage $416 110
Tgal
Water Disposal $1,132 110
Tgal
TOTAL YEARLY COSTS $97,512
RECOMMENDED SAVINGS* $41,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $20,756 $102,600 $20,756
149,327
kWh
- -
02 2.6211: Conserve energy by efficient use of vending machines $772 $450 $772
5,550
kWh
- -
03 2.8112: Combine utility meters $453 $2,200 - - $453
04 2.3212: Optimize plant power factor $816 $4,683 - - $816
05 2.7491: Insulate glazing, walls, ceilings, and roofs $11,355 $382,780 $6,782
48,790
kWh
$4,573
-
MMBtu
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,488 $25,000 $2,085
15,000
kWh
$403
-
MMBtu
-
07 2.7232: Replace existing hvac unit with high efficiency model $4,952 $9,900 $4,952
35,622
kWh
- -
TOTAL RECOMMENDED $41,592 $527,613 $35,347
254,289
kWh
$4,976
-
MMBtu
$1,269
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs