Assessment Year | 2024 |
---|---|
Principal Product | Material handling equipment |
NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
60,000
ft2
|
Annual Production | 150
ton
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $84,193 | 604,570 |
kWh
|
$0.14 | |
Natural Gas | $8,275 | 1,109 |
MMBtu
|
$7.46 | |
LPG | $3,496 | 142 |
MMBtu
|
$24.62 | |
Waste Disposal Costs | |||||
Water Usage | $416 | 110 |
Tgal
|
$3.78 | |
Water Disposal | $1,132 | 110 |
Tgal
|
$10.29 | |
TOTAL YEARLY COSTS | $97,512 | ||||
RECOMMENDED SAVINGS* | $41,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $20,756 | $102,600 |
$20,756
149,327
kWh
|
- | - | |
02 | 2.6211: Conserve energy by efficient use of vending machines | $772 | $450 |
$772
5,550
kWh
|
- | - | |
03 | 2.8112: Combine utility meters | $453 | $2,200 | - | - | $453 | |
04 | 2.3212: Optimize plant power factor | $816 | $4,683 | - | - | $816 | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $11,355 | $382,780 |
$6,782
48,790
kWh
|
$4,573
-
MMBtu
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,488 | $25,000 |
$2,085
15,000
kWh
|
$403
-
MMBtu
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $4,952 | $9,900 |
$4,952
35,622
kWh
|
- | - | |
TOTAL RECOMMENDED | $41,592 | $527,613 |
$35,347
254,289
kWh
|
$4,976
-
MMBtu
|
$1,269 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs