Assessment Year | 2024 |
---|---|
Principal Product | machined aerospace parts |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 132 |
Plant Area |
245,000
ft2
|
Annual Production | 2,184,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $972,620 | 9,726,200 |
kWh
|
$0.10 | |
Electricity Fees | $44,787 | - |
|
- | |
Natural Gas | $12,067 | 1,692 |
MMBtu
|
$7.13 | |
Waste Disposal Costs | |||||
Water Usage | $16,751 | 2,811 |
Tgal
|
$5.96 | |
Water Disposal | $16,260 | 2,811 |
Tgal
|
$5.78 | |
TOTAL YEARLY COSTS | $1,062,485 | ||||
RECOMMENDED SAVINGS* | $201,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $51,785 | $105,814 |
$51,785
517,849
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,481 | $488 |
$7,481
74,810
kWh
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $8,094 | $626 |
$8,094
80,942
kWh
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,199 | - |
$15,199
151,986
kWh
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $66,259 | $17,620 |
$66,259
662,588
kWh
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $681 | $100 |
$681
6,812
kWh
|
|
07 | 2.7241: Install outside air damper / economizer on hvac unit | $52,088 | $38,766 |
$52,088
520,884
kWh
|
|
TOTAL RECOMMENDED | $201,587 | $163,414 |
$201,587
2,015,871
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs