ITAC Assessment: OK1110
ITAC logo
ITAC Assessment: OK1110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Medical Services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 70,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,976 4,378,920
kWh
Electricity Demand $67,675 9,337
kW-mo/yr
Natural Gas $142,116 33,449
MMBtu
Waste Disposal Costs
Water Usage $6,379 1,529
Tgal
Water Disposal $6,379 1,529
Tgal
TOTAL YEARLY COSTS $545,525
RECOMMENDED SAVINGS* $120,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $52,945 $56,850 $46,652
630,429
kWh
$6,293
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $3,264 $1,330 $3,264
44,103
kWh
- -
03 2.3212: Optimize plant power factor $5,873 $7,892 - $5,873
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $30,588 $280,800 $30,588
413,357
kWh
- -
05 2.1212: Operate boilers on high fire setting $8,594 $22,000 - - $8,594
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $15,219 $12,400 - - $15,219
-
MMBtu
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,681 $1,861 - - $2,681
-
MMBtu
08 2.4156: Establish a preventative maintenance program $996 $160 $996
13,455
kWh
- -
TOTAL RECOMMENDED $120,160 $383,293 $81,500
1,101,344
kWh
$12,166
-
kW-mo/yr
$26,494
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs