ITAC Assessment: IA0123
ITAC logo
ITAC Assessment: IA0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Farm equipment
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 294,000
ft2
Annual Production 3,643
pieces
Production Hrs. Annual 1,733
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,615 2,895,662
kWh
Natural Gas $74,549 18,729
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,926 $9,325 $1,926
36,342
kWh
-
02 2.7135: Install occupancy sensors $1,494 $1,659 $1,494
27,843
kWh
-
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $764 $2,562 - $764
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $576 $50 $576
10,844
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $465 $80 $465
8,792
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $434 $10 $434
8,206
kWh
-
TOTAL RECOMMENDED $5,659 $13,686 $4,895
92,027
kWh
$764
-
MMBtu
TOTAL IMPLEMENTED $3,266 $11,937 $2,502
47,186
kWh
$764
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs