ITAC Assessment: OK1108
ITAC logo
ITAC Assessment: OK1108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aircraft Parts and Auxiliary Equipment
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 51,512
ft2
Annual Production 5,200
units
Production Hrs. Annual 3,744
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,251 865,636
kWh
Electricity Demand $35,838 3,934
kW-mo/yr
Natural Gas $31,616 1,622
MMBtu
Waste Disposal Costs
Water Usage $2,216 198
Tgal
Water Disposal $607 24
Tgal
TOTAL YEARLY COSTS $139,528
RECOMMENDED SAVINGS* $34,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,354 $29,487 $7,977
99,710
kWh
$2,377
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,075 $1,600 $1,075
13,432
kWh
-
03 2.9114: Use solar heat to make electricty $18,323 $172,200 $18,323
229,040
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $405 $503 $350
4,380
kWh
$55
-
kW-mo/yr
05 2.4239: Eliminate or reduce compressed air usage $420 - $420
5,256
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,784 $906 $3,784
47,304
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $586 $430 $577
7,213
kWh
$9
-
kW-mo/yr
TOTAL RECOMMENDED $34,947 $205,126 $32,506
406,335
kWh
$2,441
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs