ITAC Assessment: OK1105
ITAC logo
ITAC Assessment: OK1105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Consulting services
NAICS 541330: Engineering Services
SIC 8711: Engineering Services
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 86,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,379 5,396,700
kWh
Electricity Demand $111,172 9,675
kW-mo/yr
Waste Disposal Costs
Water Usage $5,228 1,194
Tgal
Water Disposal $3,188 1,194
Tgal
TOTAL YEARLY COSTS $501,967
RECOMMENDED SAVINGS* $66,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,188 $76,732 $6,558
93,686
kWh
$4,630
-
kW-mo/yr
02 2.7211: Clean and maintain refrigerant condensers and towers $946 $2,625 $946
13,520
kWh
-
03 2.9114: Use solar heat to make electricty $16,261 $153,900 $16,261
232,310
kWh
-
04 2.7135: Install occupancy sensors $1,049 - $1,049
14,982
kWh
-
05 2.4156: Establish a preventative maintenance program $98 $240 $98
1,395
kWh
-
06 2.6218: Turn off equipment when not in use $10,297 - $10,297
147,108
kWh
-
07 2.7226: Use computer programs to optimize hvac performance $25,871 $104,300 $25,871
369,588
kWh
-
08 2.7135: Install occupancy sensors $844 $1,080 $844
12,055
kWh
-
TOTAL RECOMMENDED $66,554 $338,877 $61,924
884,644
kWh
$4,630
-
kW-mo/yr
TOTAL IMPLEMENTED $1,044 $2,865 $1,044
14,915
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs