ITAC Assessment: OK1089
ITAC logo
ITAC Assessment: OK1089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 100,000
ft2
Annual Production 480,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,425 3,620,400
kWh
Electricity Demand $70,254 13,190
kW-mo/yr
Natural Gas $373,806 37,804
MMBtu
Waste Disposal Costs
Water Usage $45,856 12,484
Tgal
Water Disposal $2,256 645
Tgal
TOTAL YEARLY COSTS $758,597
RECOMMENDED SAVINGS* $25,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,064 $22,000 - - $5,064
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $2,905 $14,300 $2,905
39,258
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $4,600 $2,921 $4,040
54,600
kWh
$560
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,067 - $2,067
27,930
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,107 $2,128 $10,107
136,581
kWh
- -
06 2.7444: Close holes and openings in building such as broken windows $1,039 $2,100 - - $1,039
-
MMBtu
TOTAL RECOMMENDED $25,782 $43,449 $19,119
258,369
kWh
$560
-
kW-mo/yr
$6,103
-
MMBtu
TOTAL IMPLEMENTED $25,782 $43,449 $19,119
258,369
kWh
$560
-
kW-mo/yr
$6,103
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs