ITAC Assessment: OK1088
ITAC logo
ITAC Assessment: OK1088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aircraft Refurbishment & Parts Manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 98,000
ft2
Annual Production 600
ton
Production Hrs. Annual 7,696
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,937 5,998,732
kWh
Electricity Demand $315,973 14,382
kW-mo/yr
Electricity Fees $21,914 -
Natural Gas $58,838 6,348
MMBtu
Waste Disposal Costs
Water Usage $50,603 12,345
Tgal
Water Disposal $67,596 12,345
Tgal
TOTAL YEARLY COSTS $814,861
RECOMMENDED SAVINGS* $113,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $3,911 $3,927 - - $3,911 -
02 2.8121: Apply for tax-free status for energy purchases $19,066 - - - - $19,066
03 2.7142: Utilize higher efficiency lamps and/or ballasts $32,898 $25,297 $21,254
425,074
kWh
$11,644
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,763 $3,150 $1,763
35,259
kWh
- - -
05 2.9114: Use solar heat to make electricty $15,967 $218,400 $15,242
304,830
kWh
$725
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,555 $1,225 $4,555
91,104
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $2,964 $446 $1,844
36,880
kWh
$1,120
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $4,914 - $4,914
98,287
kWh
- - -
09 2.7241: Install outside air damper / economizer on hvac unit $6,600 $14,300 $6,600
132,000
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,923 $16,543 $20,923
418,464
kWh
- - -
TOTAL RECOMMENDED $113,561 $283,288 $77,095
1,541,898
kWh
$13,489
-
kW-mo/yr
$3,911 $19,066
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs