ITAC Assessment: OK1082
ITAC logo
ITAC Assessment: OK1082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Sausages and other prepared meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 227
Plant Area 50,000
ft2
Annual Production 77,000,000
lb
Production Hrs. Annual 5,148
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,517 7,606,466
kWh
Electricity Fees $20,841 -
Natural Gas $122,985 30,292
MMBtu
Waste Disposal Costs
Water Usage $206,777 62,850
Tgal
TOTAL YEARLY COSTS $959,120
RECOMMENDED SAVINGS* $99,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,804 $14,599 $11,804
147,544
kWh
02 2.9114: Use solar heat to make electricty $22,696 $230,880 $22,696
283,699
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,649 $2,715 $12,649
158,118
kWh
04 2.4221: Install compressor air intakes in coolest locations $3,847 $323 $3,847
48,092
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,243 - $2,243
28,032
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,475 $36,319 $46,475
580,936
kWh
TOTAL RECOMMENDED $99,714 $284,836 $99,714
1,246,421
kWh
TOTAL IMPLEMENTED $74,775 $53,956 $74,775
934,690
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs