ITAC Assessment: AR0040
ITAC logo
ITAC Assessment: AR0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Processed Turkeys
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 490
Plant Area 100,000
ft2
Annual Production 117,000,000
lb
Production Hrs. Annual 4,171
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,511,133 27,473,623
kWh
Natural Gas $32,381 11,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,273 $250 $1,273
23,154
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,679 $887 $1,679
30,481
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,921 $870 $1,921
34,877
kWh
-
04 2.4133: Use most efficient type of electric motors $3,622 $4,610 $3,622
65,944
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $770 $456 $770
14,068
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $56,477 $1,000 - $56,477
-
MMBtu
07 2.2135: Repair and eliminate steam leaks $16,520 $1,000 - $16,520
-
MMBtu
TOTAL RECOMMENDED $82,262 $9,073 $9,265
168,524
kWh
$72,997
-
MMBtu
TOTAL IMPLEMENTED $82,262 $9,073 $9,265
168,524
kWh
$72,997
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs