ITAC Assessment: OK1045
ITAC logo
ITAC Assessment: OK1045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 106,000
ft2
Annual Production 664,633
lb
Production Hrs. Annual 2,860
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,822 1,926,024
kWh
Electricity Demand $135,840 13,112
kW-mo/yr
Electricity Fees $758 -
Natural Gas $29,857 4,483
MMBtu
Waste Disposal Costs
Water Usage $7,565 705
Tgal
TOTAL YEARLY COSTS $308,842
RECOMMENDED SAVINGS* $19,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,011 $14,146 $5,918
84,546
kWh
$2,093
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $3,431 - $3,431
49,012
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,356 $512 $3,356
47,947
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $527 - $527
7,522
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,363 $528 $841
12,012
kWh
$522
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $1,380 - $1,380
19,710
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,188 $2,563 $1,188
16,972
kWh
- -
08 2.7491: Insulate glazing, walls, ceilings, and roofs $140 $110 - - $140
-
MMBtu
TOTAL RECOMMENDED $19,396 $17,859 $16,641
237,721
kWh
$2,615
-
kW-mo/yr
$140
-
MMBtu
TOTAL IMPLEMENTED $16,040 $17,347 $13,285
189,774
kWh
$2,615
-
kW-mo/yr
$140
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs