ITAC Assessment: OK1033
ITAC logo
ITAC Assessment: OK1033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Gray and ductile iron castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 65,000
ft2
Annual Production 3,960,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,024 3,050,400
kWh
Electricity Demand $124,203 14,066
kW-mo/yr
Electricity Fees $216 -
Natural Gas $34,375 5,787
MMBtu
Waste Disposal Costs
Water Usage $9,500 2,500
Tgal
TOTAL YEARLY COSTS $351,318
RECOMMENDED SAVINGS* $15,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,265

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,433 $2,100 $5,433
90,555
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,570 $27,786 $4,836
80,595
kWh
$2,734
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $262 $700 $209
3,488
kWh
$53
-
kW-mo/yr
-
04 2.7261: Install timers and/or thermostats $343 - $147
2,450
kWh
- $196
-
MMBtu
05 2.3191: Use demand controller or load shedder $2,056 $671 - $2,056
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,664 $31,257 $10,625
177,088
kWh
$4,843
-
kW-mo/yr
$196
-
MMBtu
TOTAL IMPLEMENTED $13,265 $30,586 $10,478
174,638
kWh
$2,787
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs