| Assessment Year | 2020 |
|---|---|
| Principal Product | Electric motors, water system, fueling system |
| NAICS | 335312: Motor and Generator Manufacturing |
| SIC | 3621: Motors and Generators |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
332,000
ft2
|
| Annual Production | 39,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $487,311 | 9,429,700 |
kWh
|
$0.052 | |
| Electricity Demand | $158,344 | 52,096 |
kW-mo/yr
|
$3.04 | |
| Electricity Fees | $7,729 | - |
|
- | |
| Natural Gas | $101,361 | 16,936 |
MMBtu
|
$5.98 | |
| LPG | $20,419 | 981 |
MMBtu
|
$20.81 | |
| Waste Disposal Costs | |||||
| Water Usage | $13,121 | 301 |
Tgal
|
$43.59 | |
| TOTAL YEARLY COSTS | $788,285 | ||||
| RECOMMENDED SAVINGS* | $51,648 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $49,321 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7231: Use radiant heater for spot heating | $34,672 | $127,500 | - | - |
$34,672
-
MMBtu
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $3,684 | $2,420 | - | - |
$3,684
-
MMBtu
|
- | |
| 03 | 2.2511: Insulate bare equipment | $5,805 | $65 |
$5,805
111,629
kWh
|
- | - | - | |
| 04 | 2.1113: Reduce combustion air flow to optimum | $3,427 | $1,500 | - | - |
$3,427
-
MMBtu
|
- | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $1,779 | $2,207 |
$1,779
34,206
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,733 | $8,651 |
$1,368
26,312
kWh
|
$365
-
kW-mo/yr
|
- | - | |
| 07 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $548 | - | - | - | - |
$548
-
MMBtu
|
|
| TOTAL RECOMMENDED | $51,648 | $142,343 |
$8,952
172,147
kWh
|
$365
-
kW-mo/yr
|
$41,783
-
MMBtu
|
$548
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $49,321 | $140,136 |
$7,173
137,941
kWh
|
$365
-
kW-mo/yr
|
$41,783
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs