Assessment Year | 2019 |
---|---|
Principal Product | Heat treatment for aluminum products |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 27 |
Plant Area |
42,000
ft2
|
Annual Production | 2,500,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,652 | 2,579,200 |
kWh
|
$0.042 |
Electricity Demand | $153,936 | 7,828 |
kW-mo/yr
|
$19.66 |
Electricity Fees | $14,574 | - |
|
- |
Natural Gas | $49,902 | 11,214 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | $326,064 | |||
RECOMMENDED SAVINGS* | $15,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,873 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $4,858 | - |
$4,858
116,508
kWh
|
- | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,617 | $1,676 |
$2,617
62,765
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,564 | $12,651 |
$2,774
66,514
kWh
|
$2,790
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,148 | $1,560 |
$1,148
27,525
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $686 | $405 |
$291
6,969
kWh
|
$395
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $262 | $106 |
$262
6,290
kWh
|
- | |
TOTAL RECOMMENDED | $15,135 | $16,398 |
$11,950
286,571
kWh
|
$3,185
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $14,873 | $16,292 |
$11,688
280,281
kWh
|
$3,185
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs