Assessment Year | 2019 |
---|---|
Principal Product | Air Filters |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 336 |
Plant Area |
451,400
ft2
|
Annual Production | 104,752
units
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $184,269 | 4,244,240 |
kWh
|
$0.043 | |
Electricity Demand | $92,022 | 8,596 |
kW-mo/yr
|
$10.71 | |
Electricity Fees | $4,692 | - |
|
- | |
Natural Gas | $20,423 | 4,228 |
MMBtu
|
$4.83 | |
Waste Disposal Costs | |||||
Water Usage | $3,237 | 1,015 |
Tgal
|
$3.19 | |
TOTAL YEARLY COSTS | $304,643 | ||||
RECOMMENDED SAVINGS* | $29,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $18,566 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $8,453 | $37,361 |
$4,919
114,400
kWh
|
$3,534
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,469 | $833 |
$2,469
57,412
kWh
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,224 | - |
$2,224
51,724
kWh
|
- | - | - | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $7,915 | - | - |
$7,915
-
kW-mo/yr
|
- | - | |
05 | 2.3212: Optimize plant power factor | $365 | $1,365 | - | - | $365 | - | |
06 | 2.8123: Pay utility bills on time | $371 | - | - | - | $371 | - | |
07 | 2.7261: Install timers and/or thermostats | $8,182 | $1,430 | - | - | - |
$8,182
-
MMBtu
|
|
TOTAL RECOMMENDED | $29,979 | $40,989 |
$9,612
223,536
kWh
|
$11,449
-
kW-mo/yr
|
$736 |
$8,182
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,566 | $2,263 |
$2,469
57,412
kWh
|
$7,915
-
kW-mo/yr
|
- |
$8,182
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs