| Assessment Year | 1996 |
|---|---|
| Principal Product | paint |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
100,000
ft2
|
| Annual Production | 3,500
Tgal
|
| Production Hrs. Annual | 2,470
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,397 | 1,639,801 |
kWh
|
$0.035 |
| Electricity Demand | $37,320 | 7,464 |
kW-mo/yr
|
$5.00 |
| Electricity Fees | $8,694 | - |
|
- |
| Natural Gas | $17,470 | 8,800 |
MMBtu
|
$1.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,575 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,224 | $2,223 |
$1,300
37,222
kWh
|
$924
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $213 | $442 |
$126
3,517
kWh
|
$87
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $116 | $225 |
$68
2,052
kWh
|
$48
-
kW-mo/yr
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $969 | $25 |
$573
16,413
kWh
|
$396
-
kW-mo/yr
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $351 | $361 |
$195
5,569
kWh
|
$156
-
kW-mo/yr
|
- | - | |
| 06 | 2.1213: Direct warmest air to combustion intake | $127 | $680 | - | - |
$127
-
MMBtu
|
- | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $12,056 | $4,500 |
$5,900
168,523
kWh
|
$6,156
-
kW-mo/yr
|
- | - | |
| 08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,734 | $20,000 | - | - | - |
$6,734
-
lb
|
|
| TOTAL RECOMMENDED | $22,790 | $28,456 |
$8,162
233,296
kWh
|
$7,767
-
kW-mo/yr
|
$127
-
MMBtu
|
$6,734
-
lb
|
||
| TOTAL IMPLEMENTED | $2,575 | $2,584 |
$1,495
42,791
kWh
|
$1,080
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs