Assessment Year | 2005 |
---|---|
Principal Product | Cereal breakfast foods |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
66,000
ft2
|
Annual Production | 6,400,000
ton
|
Production Hrs. Annual | 4,271
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,078 | 2,939,700 |
kWh
|
$0.042 |
Electricity Demand | $17,252 | 6,714 |
kW-mo/yr
|
$2.57 |
Electricity Fees | $23,966 | - |
|
- |
Natural Gas | $52,293 | 9,255 |
MMBtu
|
$5.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $148,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 4.322: Eliminate old stock and modify inventory control | $129,307 | $21,049 |
$14,249
492,750
kWh
|
- | $115,058 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,061 | $7,690 |
$6,305
104,742
kWh
|
$756
-
kW-mo/yr
|
- | |
03 | 2.1213: Direct warmest air to combustion intake | $6,374 | $5,000 |
$6,374
105,921
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,540 | $5,000 |
$3,262
54,269
kWh
|
$278
-
kW-mo/yr
|
- | |
05 | 2.6218: Turn off equipment when not in use | $859 | $806 |
$767
12,734
kWh
|
$92
-
kW-mo/yr
|
- | |
06 | 2.1213: Direct warmest air to combustion intake | $721 | $1,300 |
$721
11,974
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $463 | $100 |
$427
7,104
kWh
|
$36
-
kW-mo/yr
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $255 | $553 |
$228
3,849
kWh
|
$27
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $88 | $525 |
$88
1,466
kWh
|
- | - | |
TOTAL RECOMMENDED | $148,668 | $42,023 |
$32,421
794,809
kWh
|
$1,189
-
kW-mo/yr
|
$115,058 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs