Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 163,633
ft2
Annual Production 31,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,377 1,262,950
kWh
Electricity Demand $30,357 3,729
kW-mo/yr
Natural Gas $68,056 7,770
MMBtu
Waste Disposal Costs
Water Usage $15,338 265
Tgal
TOTAL YEARLY COSTS $208,128
RECOMMENDED SAVINGS* $21,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $1,051 $590 $1,051
14,018
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,833 $8,422 $4,833
64,438
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,575 $29,950 $15,575
207,667
kWh
TOTAL RECOMMENDED $21,459 $38,962 $21,459
286,123
kWh
TOTAL IMPLEMENTED $21,459 $38,962 $21,459
286,123
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs