ITAC Assessment: OK0983
ITAC logo
ITAC Assessment: OK0983
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Stampings, Tools, Dies & machined parts
NAICS 332721: Precision Turned Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 20,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,288
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,595 458,480
kWh
Natural Gas $3,430 578
MMBtu
Waste Disposal Costs
Water Usage $2,992 217
Tgal
TOTAL YEARLY COSTS $44,017
RECOMMENDED SAVINGS* $32,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,260 $1,710 $1,260
15,362
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $192 $530 $192
2,340
kWh
- -
03 2.2437: Recover waste heat from equipment $469 $1,256 - $469
-
MMBtu
-
04 2.7241: Install outside air damper / economizer on hvac unit $5,532 $10,700 $5,532
67,461
kWh
- -
05 2.7211: Clean and maintain refrigerant condensers and towers $395 $1,140 $395
4,820
kWh
- -
06 2.7231: Use radiant heater for spot heating $1,816 $4,820 - $1,816
-
MMBtu
-
07 2.4322: Use or replace with energy efficient substitutes $19,912 $205,700 $2,752
33,557
kWh
- $17,160
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,009 $4,410 $2,009
24,504
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $588 $4,500 $588
7,176
kWh
- -
TOTAL RECOMMENDED $32,173 $234,766 $12,728
155,220
kWh
$2,285
-
MMBtu
$17,160
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs