Assessment Year | 2018 |
---|---|
Principal Product | Stampings, Tools, Dies & machined parts |
NAICS | 332721: Precision Turned Product Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 23 |
Plant Area |
20,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 2,288
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $37,595 | 458,480 |
kWh
|
$0.082 | |
Natural Gas | $3,430 | 578 |
MMBtu
|
$5.93 | |
Waste Disposal Costs | |||||
Water Usage | $2,992 | 217 |
Tgal
|
$13.79 | |
TOTAL YEARLY COSTS | $44,017 | ||||
RECOMMENDED SAVINGS* | $32,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,260 | $1,710 |
$1,260
15,362
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $192 | $530 |
$192
2,340
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $469 | $1,256 | - |
$469
-
MMBtu
|
- | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $5,532 | $10,700 |
$5,532
67,461
kWh
|
- | - | |
05 | 2.7211: Clean and maintain refrigerant condensers and towers | $395 | $1,140 |
$395
4,820
kWh
|
- | - | |
06 | 2.7231: Use radiant heater for spot heating | $1,816 | $4,820 | - |
$1,816
-
MMBtu
|
- | |
07 | 2.4322: Use or replace with energy efficient substitutes | $19,912 | $205,700 |
$2,752
33,557
kWh
|
- | $17,160 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,009 | $4,410 |
$2,009
24,504
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $588 | $4,500 |
$588
7,176
kWh
|
- | - | |
TOTAL RECOMMENDED | $32,173 | $234,766 |
$12,728
155,220
kWh
|
$2,285
-
MMBtu
|
$17,160 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs