ITAC Assessment: OK0977
ITAC logo
ITAC Assessment: OK0977
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aerospace Composites
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 58,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 4,015
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,936 1,220,480
kWh
Electricity Demand $13,660 1,952
kW-mo/yr
Natural Gas $46,958 7,619
MMBtu
TOTAL YEARLY COSTS $200,554
RECOMMENDED SAVINGS* $32,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $2,612 $910 - - - $2,612
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $609 $912 - - - $609
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,920 $14,920 $3,920
34,091
kWh
$1,000
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $871 $1,272 $871
7,577
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,443 $2,300 $1,443
10,096
kWh
- - -
06 2.3212: Optimize plant power factor $16,088 $1,209 - - $16,088 -
07 2.7211: Clean and maintain refrigerant condensers and towers $67 $208 $67
584
kWh
- - -
08 2.2514: Cover open tanks $5,491 $1,301 - - - $5,491
-
MMBtu
TOTAL RECOMMENDED $32,101 $23,032 $6,301
52,348
kWh
$1,000
-
kW-mo/yr
$16,088 $8,712
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs