Assessment Year | 2017 |
---|---|
Principal Product | Aircraft manufacturing & assembly |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
172,515
ft2
|
Annual Production | 710,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $317,872 | 6,852,113 |
kWh
|
$0.046 |
Electricity Demand | $302,611 | 15,723 |
kW-mo/yr
|
$19.25 |
Electricity Fees | $1,866 | - |
|
- |
Natural Gas | $14,836 | 2,823 |
MMBtu
|
$5.26 |
TOTAL YEARLY COSTS | $637,185 | |||
RECOMMENDED SAVINGS* | $69,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $25,427 | $24,531 | - | - | $25,427 | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $19,832 | $46,320 |
$9,110
198,037
kWh
|
$10,722
-
kW-mo/yr
|
- | - | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $9,584 | $9,120 |
$9,584
208,352
kWh
|
- | - | - | |
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $2,312 | $1,015 |
$1,061
23,061
kWh
|
$1,251
-
kW-mo/yr
|
- | - | |
05 | 2.7224: Reduce space conditioning during non-working hours | $685 | - |
$385
8,364
kWh
|
- | - |
$300
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,429 | $2,713 |
$9,429
204,984
kWh
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,048 | $438 |
$1,048
22,776
kWh
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,181 | - |
$1,181
25,667
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $69,498 | $84,137 |
$31,798
691,241
kWh
|
$11,973
-
kW-mo/yr
|
$25,427 |
$300
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs